West End, NC
This Geothermal project was for a new 2 story home in West End, NC. A new 4.0 ton unit was installed with new duct work  
by Sunbelt Mechanical - Aberdeen, NC. 9 - 90' boreholes with 1 - 1" x 95' loop in each borehole.
Drilling the 1st of 9 - 90' boreholes with mud rotary. All 9 boreholes completed.
Drilling the 1st of 9 - 90' boreholes with mud rotary.
All 9 boreholes completed.
Mud rotary drilling. 1
1" vertical loop laid out for placement in borehole.
Mud rotary drilling.
1 Loop grouted in borehole with Thermal-Enhanced grout.
1" vertical loop with rebar attached for weight and to keep loop
straight.
Loop grouted in borehole with Thermal-Enhanced grout.
Vertical loops grouted with Thermal-Enhanced Grout.
Vertical loops grouted with Thermal-Enhanced Grout.